The Galleries Apartments Donabate Co. Dublin
Residential development consisting of 2 separate blocks, with a basement car park below Block 1 and including site development works.
Residential development consisting of 2 separate blocks, with a basement car park below Block 1 and including site development works.
Refurbishment and retrofit of the existing social housing complex including the addition of two new floors of accommodation over the existing building, the total area of the completed development will be c.8550sq.m over 6 floors, providing a total of 80 number apartments with associated balconies. The building will comprise of 23 No. 1 bedroom apartments, 44 No. 2 bedroom apartments, 2 No. 3 bedroom apartments, 8 No. 3 bedroom duplex units and 3 No. 4 bedroom apartments. The removal of Gloucester Lane to the East and adjacent railed green space to provide secure residents parking with 27 No. car parking spaces.
This project involved the construction and fit out of three blocks including retail units.Full mechanical and electrical installations formed part of the works as well as interior finishes to retail and chemist shops.
Six Town-houses and fifteen apartments including penthouse were fitted out which included kitchens, bathrooms and bedrooms.
Construction of 16 no apartments, single storey general purpose room and adjoining 2 storey activity and training workshop. These apartments were constructed for Sunbeam House Services who provide a range of supports such as education and care to adults with intellectual disabilities. All works were completed on a live operational site.
The construction of the Sheltered Housing Development for Clanmill housing association to provide fully accessible living accommodation for up to 24 persons with varying levels of physical disability. The building was constructed over two and three storeys.
The works include the taking down of trees on the site, demolition of existing foundations and slab to previously demolished dwelling on site. The new apartment block consists of 10 No. own door apartments, gym and 1 No. office suite in a block varying from one to three storeys on the site and all ancillary works. The gross floor area is 3300m2.
Completion of 60 apartments consisting of fit out and remedial works to existing structure inc car park
16 number house residential project on a two acre site in Mountrath Co.laois. Detached three bedroom semi – detached and four bedroom detached houses in a private development with high specification finishes throughout.
Complete refurbishment of this period building. New modern extension at rear, landscaping and paving works. Internal finishes throughout maintaining the original building features. Cleaning and repointing to the external listed brickwork façade.